Products — Four Families
Four product families spanning one building, from structure to interior.
Four product families — wood, windows, steel and BIPV.

Wood products
木制品Wood doors · Wall panels · Custom furniture · 42 models

Aluminium doors & windows
铝合金门窗System windows · Sunrooms · Glass railings · 12 systems

Steel products
钢结构产品Prefab villas · Members · Modular pods · 18 models

Building-integrated PV
建筑一体化光伏Solar tiles · Facades · Skylights · Pavement · 14 products
Who makes each product line
Four product lines from four different factories. Silvora holds the brand authorization and handles selection, quotation and export.
| Product line | Made and supplied |
|---|---|
| Wood products | Made by Anhui Fuhuang Wood Industry Co., Ltd. — a 60,000 m² plant, German Homag lines and CNC centres, 0.1mm tolerance, ISO 9001. Silvora holds the brand authorization and handles selection, quotation and export. |
| Aluminium doors & windows | Made by Anhui Fuhuang Doors & Windows Co., Ltd. — a 66,700 m² site in Chaohu, five window and door lines, 800,000 m² a year. Silvora holds the brand authorization for sales and export. |
| Steel products | Made by Anhui Fuhuang Steel Structure Co., Ltd. — low-rise prefab villas and prefab building systems, plus H-section, box, tube and truss members; a 500,000 m² base in Hefei, four fabrication sites, 1,000,000 tonnes a year. Silvora holds the brand authorization for sales and export. |
| Building-integrated PV | Made by Einnova Solarline Energy Corp. Limited — four manufacturing bases in China and Taiwan, 2 GW a year (1.5 GW standard plus 0.5 GW custom and BIPV). Silvora is the authorized sales and export party. |
Delivery, by product line
Every figure below is the one used in that product line’s own quotation terms.
| Stage | Wood products | Aluminium | Steel products | BIPV |
|---|---|---|---|---|
| StageQuotation | Wood productsWithin 48 hours | AluminiumWithin 48 hours | Steel productsPer project | BIPVWithin 48 hours |
| StageDesign / samples | Wood productsAbout 15 days; samples charged at unit price | Aluminium15 days, including design sign-off | Steel productsDetailed to drawing, then fabricated | BIPV15 days, including layout and selection sign-off |
| StageProduction | Wood products30–45 days, with a rush channel for urgent orders | Aluminium30–45 days, depending on order size and complexity | Steel productsScheduled to the project programme | BIPV30–45 days, depending on order size and module supply |
| StageMinimum order | Wood productsTypically 50–100 units by category | AluminiumAssessed per project; container loads preferred | Steel productsAssessed against tonnage and the project | BIPVAssessed per project; container loads preferred |